top of page

Office building 48 floors
CLIENT
Constrol
LOCATION
Israel
YEAR
2021
Completed the design of the project according to the finished drawings of the office building: concrete and architectural parts. Checked and corrected drawing errors in the model. Coordinated and fixed intersections and collisions. Set up materials, built stained glass windows and steel structures to install them. After the design was completed, a full bill of materials (BOQ) was performed and the cost of the project was calculated.
![]() | ![]() | ![]() | ![]() |
---|---|---|---|
![]() |
bottom of page